This Tritium facility modification project is being initiated to procure and install a new vault door as a replacement for the current door set in …
We are removing the valve and thus converting the fire suppression system in Room 54 to a permanently "wet" system.…
The scope is to design and replace the IML AHU system with equivalent equipment that is more reliable and maintainable.…
The purpose of this modification is to provide for the design, fabrication, and installation of new extraction equipment stands and cask trolley to…
The proposed activity (PA) is a redesign of the existing Modular Stripper (MDST) blowers under MT-TRI-2021-00034.…
Backup of Sewage in Building 706-6F occurred on March 26, 2020. Operations or STR will assess and repair the line and will decontaminate sewage as …
Implement modifications to Building 751-1A that include drilling into transite to mount photoluminescent exit signs and to relocate an electrical r…
703-46A: Replace carpet in offices 215, 217, 226, 232 and 235.…
Replace high bay lights in building 784-7A.…
The roof on 105-L over the dissassembly basin will be removed and replaced.…