Replace 218-1H Overhead Door with Roll-Up Door.…
This modification will replace the existing 234-H FACP with the manufacturer’s suggested replacement panel that will provide compatibility with all…
The DCF outlines some caustic delivery improvements to 221-H through piping modifications and repurposing.…
To prevent water intrusion into the 105-K Building at the North Side Handball Court area, prep and apply Blue Max sealant in roof plugs area.…
Clean and repaint walls in 701-1K.…
Repair Building 264-2H roof.…
Perform inspection and repair of the Concrete CHEX plenums running North-South under B and C-005 prior to implementation of DSA Rev 2.…
Staining from a potential rain water leak has occurred along the exterior of some cell windows located in F-091.…
Remove old door and frame in 735-A, B-101 and replace with new 90-minute fire door and frame, also replace broken wallboard on north wall in 735-A,…
Removal of Back-Up Offgas Film Cooler Brush…