This EEC covers routine maintenance, troubleshooting activities, and repairs resulting from troubleshooting activities conducted on underground sto…
The existing Saltstone Disposal Unit (SDU) (formerly referred to as Vault) 4 weather enclosures have reached the end of their useful life and are b…
The EEC covers the renovations for the interior of building 713-1N.…
703-46A: Replace carpet in offices 215, 217, 226, 232 and 235.…
709-7G Repair holes in bedroom fire wall.…
Install a new receptacle in 264-H, room 102 to support TPC equipment rack.…
The three obsolete water cooled lasermarkers in 234-H will be replaced with two new air cooled lasermarkers.…
WAPA proposes to repair access road erosion damage in the central portion of the Path 15 transmission line.…
KESSELRING SITE MARF DEFUELING AND ASSOCIATED DEFUELING FACILITY PROJECT
Bonneville Power Administration (BPA) proposes to replace damaged lattice-steel to include leg, footing and additional members on two electrical tr…