Subcontractor will provide a roof replacement at 730-B.…
The EEC covers the renovations to the interior of building 717-8N.…
Bonneville Power Administration (BPA) proposes to provide funds to the Nez Perce Tribe of Idaho (NPT) to perform routine maintenance actions for th…
705-C Habitability repairs.…
This EEC will cover the repair of the underground M-1 Air Stripper header per Work order 01992928.…
607-70G: Remove grout from boat clarifier inside oxidation ditch No. 1.…
Run copper cable from 719-5N to 704-199N.…
The U.S. Department of Energy proposes to operate and maintain the South Table Mountain Energy Park (STEP) as part of the National Renewable Energy…
The chemical control system at 780-2A will be replaced.…
Repair broken water line inside concrete wall and remodel 701-13G.…