Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to conduct routine vegetation management along its Curecanti-Lost C…
Remove and Replace Door 1002, L-Reactor Building Personnel Wing to improve closing and locking of door.…
Extend breakroom on south side of Bldg. 717-8N.…
714-5N, Facility Renovation, which includes civil and electrical repairs and renovations.…
780-2A Chemical tank removal and grout chemical dike.…
736-A Room 104,107, and 108 Remodel.…
Replace soda ash piping and pumps at 607-59G.…
The scope of the activity includes the chipping and removal of material approximately 1.5 ft x 4 ft to expose the area in front of the recycle sump…
A Dominion Energy subcontractor, Marshfield Forest Service, will be conducting herbicide applications to the 115-kV and 230-kV electricity transmis…
The iAir (electronic control) capability for humidity control is being removed from the Saltstone Administrative Building Air Handling Units.…