Refurbish restrooms in 704-49S.…
Contractor to clean/dispose of bird droppings located in 722-4A.…
703-10B Soffit and gable repair, prep, and paint (Dog kennels).…
Subcontractor will provide roof repairs at 730-4B.…
Subcontractor will provide roof repairs at 151-2C.…
A vendor will generate and/or remove excess wastewater from various systems/containments located across SRS.…
The chillers are going to be overhauled in the future
Bonneville Power Administration (BPA) proposes to replace the municipal water supply service into the BPA owned and operated Aberdeen 115 kV substation control house.
The Bonneville Power Administration (BPA) proposes to install a disconnect switch and supporting footing adjacent to Structure 18/5 of the Mack’s Inn – Madison Transmission Line.
The US Department of Energy (DOE) proposes to perform assessment, modernization, and upgrade of the existing sitewide utility systems at the Lawren…