Bonneville Power Administration (BPA) proposes to fund the Kalispel Tribe (the Tribe) to continue the rearing of triploid rainbow trout (TRBT) at t…
Bonneville Power Administration (BPA) proposes to replace marker balls between 18/1 and 18/2 on the Keller Tap to Grand Coulee-Okanogan No.2 in Fer…
This EEC covers various renovation activities for Building 703-41A.…
784-7A Boiler No. 2 Retubing.…
Caulking to be removed and replaced with non-asbestos caulking.…
Windows in 704-L need caulking. Asbestos is present in the existing window glazing material, therefore the caulk will be added with plans not to di…
The current Instrument Air (IA) High Density Polyethylene (HDPE) Poly-flo tubing is sagging alongside the northeast end of building 234-H and has p…
Insulation will be removed/installed and maintenance activities will be performed on the steam lines during the 2023 steam outage in SRTE.…
Scope of this work is to repair, reroof and recoat some of the roofs of buildings 234-H and 249-H.…
713-4N Replace door at Pipe Yard office.…