Weed spraying activities at the INL Site are not always roadside and would occasionally require travel off road to access large noxious weed infest…
The Kesselring Site Building 81 Heating, Ventilation and Air Conditioning (HVAC) project consists of replacing the Test, Recording and Monitoring Room, Computer Room, Air Conditioner units, Air Handling Unit (AHU) and Condensing...
BPA proposes to allow the Weyerhaeuser Company temporary access and permission to conduct access road improvements on BPA fee-owned land located in…
Western Area Power Administration, Sierra Nevada Region (WAPA) is responsible for the operation and maintenance of several federally owned and oper…
BPA proposes to fund the Nez Perce Tribe (NPT) to perform ongoing habitat maintenance and restoration efforts in the Red River and Newsome Creek wa…
The crude oil surge tank BHT-7 will be taken out-of-service to clean it and perform a complete internal and external API 653 inspection.
Perform an inspection of the BM 30-inch crude oil pipeline at the location(s) indicated by smart pig surveys.
Piping and supports will be modified to support Saltstone Hopper Overflow Container (SHOC) Modifications.…
Install HPC Time Server Antenna and Cable in 707-C and 703-44A.…
This carbon contamination technique referred to as regeneration will be conducted per temporary modification 233H-TMC-15-181, associated WO 1389965…