Building 201 - Demolish existing A/C foundations and bollards for units CU-3, CU-4, and CU-1. Building 202 - Demolish air handling system CCUC-19, a packaged air conditioning unit mounted on wood beams on grade. ...
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), completed emergency structure repair, landing pad construction, and access r…
Provide emergency power to Curing room at 717-5N.…
Re-asphalt area located near building 710-14N.…
Remove and re-install ceiling in Bldg. 735-A, B-001, B001 Ext. and B-002.…
This EEC covers various general renovations and modifications for Building 705-A, such as flooring/cove base replacement, ceiling tile and wall rep…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), completed emergency structure repair, landing pad construction, and access r…
Repair concrete intruder barrier and sealcoat asphalt cover at R-Reactor Seepage Basin closed waste unit.…
FTF Repair/replace Domestic Water Header Isolation Valve DW-V-49.…
Renovate women's restroom in Building 751-1A.…