Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to replace a broken sewer line at the Hayden (HDN) Substation in Ro…
Repair asphalt pavement at the 782-3A Water Treatment Facility.…
Implementing a design change (M-DCP-H-18024) to replace the existing process air compressor piping.…
Bi-Annual PM for Baileigh Hydraulic Plate Roller MOD. PR-514 at 717-3N.…
Modifications are being made to the Melter and Melter Off-Gas System to control Melter Feed Rate.…
Replace the VFD on the 120T crane hoist.…
Bonneville Power Administration (BPA) proposes to remove and replace certain fittings used to splice lengths of transmission line conductor togethe…
Bonneville Power Administration (BPA) proposes various work activities between structures 13/5 and 14/1 on the Naselle- Tarlett No. 2 transmission …
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to conduct routine vegetation management along the double circuit W…
The Kesselring Site D1 G Ditch Remediation Project will remediate soil that is contaminated with silver, mercury, and polychlorinated biphenyls (PCBs), identified in the D1 G Ditch during characterization efforts, to agreed upon cleanup standards.