Augusta Industrial will clean up and dispose of bird droppings in SRTE, Building 232-H Truckwell.…
Replace HVAC Heat Pumps and Air Handling Units for Buildings 247-H and 248-H. Existing units are original components and have reached the end of th…
TCAP Column B, along with TCAP Product Storage Bed A are to be replaced by new components.…
Renovate conferences rooms and adjacent corridors, entries, restrooms, and kitchenette in B-922 at NETL Pittsburgh, PA.…
Bonneville Power Administration (BPA) proposes to replace an existing two-pole suspension structure and associated structural and electrical compon…
Replace walkway (footbridge) at 645-4N.…
Pour new concrete pad at 713-N roll-up door.…
The 711-4N Lead Melter Complex includes a lead melter (10,000 lb) and supporting structures (dress-out hut, machining/tooling booth, material stora…
Subcontractor will provide roof repairs at 704-52E / 704-53E. The Subcontractor “will” disturb the existing roof while performing these repairs on …
Construction will remove asbestos insulation around valves CAR-C-085 and -083 to allow for maintenance activities. Asbestos insulation will be disp…