Scope of this work order is to install a temporary cooling system for the fourth level control room at 221-8H fan house.…
The Critical Utilities Rehabilitation Project (CURP) at Brookhaven National Laboratory includes replacement and/or upgrades and improvements to the…
This PLC is obsolete and needs replacement. The existing GS PLC and two remote I/O drops (2 and 3) require upgrading to the latest Emerson DeltaV c…
Replace deteriorated gutter system on north side of 294-H Sand Filter to prevent the accumulation of rainwater on the sandfilter's roof per CDCF-H-…
Renovate the 249-H kitchen (249-H, Room 119B) with new cabinets, countertops, and backsplash.…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), conducted emergency power restoration activities on the West Portal-Stillwat…
WAPA proposes to remove a total of eight dead hazard trees located within three spans on the TNI-WEA line (12/5-12/6, 12/10-12/10A, and 2/1-2/2) an…
BPA proposes to replace deteriorating wood pole structures and associated structural/electrical components (e.g. cross arms, insulators, guy anchor…
BPA proposes to fund the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) to conduct ongoing operations and management throughout 24,…
BPA proposes to fund operations and maintenance on lands owned and managed by the Kalispel Tribe in Washington and Idaho to address the negative im…