704-1N Repair/Replace emergency lighting.…
Evaluate and repair a sinkhole in the area north of 218-1H and east of the 234-H main side Air Handling Unit.…
Replace Glovebox Glass Panel T-131-331-N-30 onto the Primary Stripper No.1 (P1) Glovebox via modified open glovebox maintenance (OGM).…
WAPA proposes emergency replacement of spacers on selected spans of its CPJ-ODA transmission line.…
The wall of the elevator at 730-B will be painted.…
Revision 1 covers additional maintenance needs assoicated with flooring and underpinning.…
Subcontractor will provide gutter repair at 773-A, C-030.…
This EEC covers various general renovations for Building 781-A, such as flooring/cove base replacement, ceiling tile replacement, drilling, paintin…
Wastewater disposal for Supertherm at the Salt Waste Processing Facility.…
Removal of asbestos insulation needed to repair steam leak at 218-H…