Another source of station service needs be added to panel PDP 1 which feeds panels MHP and MEP and provide station power to the 230 kV and 500 kV y…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to conduct landing maintenance for Structure 6/3A on the double cir…
Replace sprinkler head in A-wing in accordance to NFPA 25 service life requirements.…
105-K roof expansion joint repair at between 48 and 62 elevation by subcontractor.…
To provide a safer accessible entrance route into building, activities will include the reconfiguring of two handicap parking spaces to make them s…
Vendor to replace rail ties and perform maintenance on SRS railroad.…
Repair Chilled Water Pressure Control Systems at 703-44A.…
The 16A Ferrous Sulfamate (FS) Automatic Control Valve (HQ-13) is no longer able to be remotely operated and is impeding the addition of FS to Tank…
Remove and install flooring in Building 773-A, E-Wing, Room E-031.…
Ductwork will be repaired and insulation will be replaced as needed per WO 1832178.…