Perform structural repairs on 772-F and 772-1F per the structural integrity program (SIP) inspection report T-CLC-F-00557.…
Construction personnel to remove/replace insulation around sump jet piping in Section 17 on the 2nd level.…
The scope of work for this activity is to remove the granite slabs from inside three culvert manholes, inspect the pipelines for any other blockage…
Melt cell high pressure sodium (HPS) light replacement with LED light for increased visibility.…
Melt cell high pressure sodium (HPS) light replacement with LED light for increased visibility per E-DCF-S-02877.…
This work package provides the electrical scope to troubleshoot and repair ELLV-PNL-A to include associated breakers and wiring damaged in building…
Remodel room 405 in the K-Reactor Building.…
Existing Effluent Discharge Pumps will be removed from service and pump No. 1 will be replaced with a new more reliable pump.…
BPA proposes to perform in-kind replacement of wood pole structure 9/4 and associated structural/electrical components (e.g., cross arms, insulator…
BPA proposes to fund the Washington Department of Fish and Wildlife (WDFW) to repair a section of the Sandhill Road in the Bridgeport Unit of the S…