Removal of the above ground cathodic protection system components on the TF to SS LAWTL as recommended in E-EPF-Z-00001 and E-DCFZ-475.…
Interior surface of Safety Class (SC) concrete wall under the steam condensation pipe at the eastern end of the 281-1H Delay Basin shows exposed ag…
Bonneville Power Administration (BPA) proposes to replace insulators on two structures located at 17/4 of the 500 kV Grizzly – Captain Jack No. 1 a…
BPA proposes to perform in-kind replacement of wood pole structures and associated structural/electrical components (e.g., cross arms, insulators,…
The motor circuit for (Canyon ID) pump FA2 has a solid ground fault. There remain no original radiation grade (hardened) 15 Hp motors in the in the…
The purpose for this Scope of Work (SOW) is to replace the pea gravel sidewalk located at the premises of 704-7B and 704-12B and to extend the side…
Prep and paint 105-K Outer Assembly Area Walls.…
The 292-S Diesel Fuel Oil (DFO) Underground Storage Tanks (UST) No 1 will undergo draining, cleaning and inspection. During inspection, determinati…
Remove the various oils from equipment inside 284-H as part of facility layup.…
The Power Management organization at Idaho National Laboratory (INL) must perform timely maintenance and inspection activities on power poles and s…