The scope of the activity includes the chipping and removal of material approximately 1.5 ft x 4 ft to expose the area in front of the recycle sump…
A Dominion Energy subcontractor, Marshfield Forest Service, will be conducting herbicide applications to the 115-kV and 230-kV electricity transmis…
The iAir (electronic control) capability for humidity control is being removed from the Saltstone Administrative Building Air Handling Units.…
The 115 kV transformers, both switchgears A and B, associated 4160V secondary cables, protective relaying, breakers, and control wiring, 480V trans…
Bonneville Power Administration (BPA) is proposing to replace eight deteriorating wood pole structures and any associated hardware and guys at spec…
Road 4 (2.8 miles) will be milled 2-1/2 in, paved with 1 in Open Graded Interlayer (OGI) and 2 in of asphalt, striped with thermoplastic and edge o…
Replace the Modicon Quantum PLC with an Emerson DeltaV Safety Instrumented System with Electronic Marshalling.…
This proposed activity includes the installation of a new SAS storage bed and replacing the existing Carbon Steel Nitrogen Exhaust Line for the SAS…
LM proposes to maintain ongoing facility use operations wherein LM and stakeholders would perform routine inspections, site visits and tours, and r…
Conduct routine inspections, monitoring, and maintenance activities throughout the year at both the Lakeview disposal and processing sites.…