50 Ohm Resistance Thermal Devices (RTD) shall be replaced with100 Ohm Platinum RTDs.…
Subcontractor to perform roof repairs on building 730-A.…
Refurbishing and repairing roof, windows, floors, and interior walls for 704-29E and 704-30E.…
Subcontractor will provide a roof replacement at 705-H.…
This activity is to replace the 151-1L DC breaker panel due to age and normal wear over time.…
This activity involves the installation of external oil sampling ports on various electrical transformers throughout SRS.…
Maintenance will remove/replace Tank 181 East and West strainer to inspect for blockages and clean.…
Scope of activity is Architectural and Electrical installations in Lab C-108/112 Bldg 773-A per WO 1903862.…
This modification will align 9.2E evaporator configuration to 9.1E by placing the 9.2E Vent temperature instrumentation to an Out of Service status…
One access port needs to be drilled into the top of F-Tank Farms 242-3F Concentrate Transfer System (CTS) cell cover to allow flexible hoses into t…