The EEC covers the specified renovations for the interior of building 711-2N.…
Subcontractor will perform a core sampling of roofs Buildings 232-H, 264-H, and 264-2H with SRS asbestos group.…
the men's change room/restroom in 704-L, tile is sticking up at the edges in several locations in the room and needs to be re-adheared to the floor…
The proposed activity involves swapping the electrical connections to a valve with Amphenol connectors to ease future valve replacement activities.…
703-A Room 26 Water damage repairs.…
Apply coatings to the roof of the occupied/office area section of 713-1N, seal leaks and repair the gutter on the north side of 713-1N.…
The coolant will be drained and replaced with new coolant.…
705-N Dining Room Renovation.…
234-H Inert HVAC Installing conduit for damper controls.…
Install sealant on the UV Unit at Central Sanitary Wastewater Treatment Facility (CSWTF).…