The Decon Frit Slurry Recirculation Pump experiences premature diaphragm failures. Review of the manufacturer 's literature identified operational …
Premix Air Blender No 2 Dust Collector (Z-205000-BMH-DCOL-0005) is in need of repair due to brief pressure excursion during normal operation.…
Perform cleaning, seal coating, and restriping of parking lots in A-Area, B-Area, C-Area, and N-Area.…
BPA proposes to remove a failed culvert and associated fill material. The work would include excavating approximately 20,000 cubic yards of existin…
Bonneville Power Administration (BPA) proposes to conduct routine maintenance on access roads providing access to electrical transmission infrastru…
This project would replace identified equipment within the existing Building 12-123 Complex Compressed Air System with new equipment to meet the co…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to complete yard maintenance at the Prospect Valley (PV) Tap in Wel…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to complete yard maintenance at the Prospect Valley (PV) Tap in Wel…
Bonneville Power Administration (BPA) proposes to fund the Kalispel Tribe’s ongoing resident fish habitat operations and maintenance in northeaster…
Bonneville Power Administration (BPA) proposes to perform in-kind replacement of 18 wood pole structures and associated structural/electrical compo…