Replace the current A/C unit for Conference Room a with a new Carrier 3-Ton split HVAC unit.…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to conduct routine right-of-way (ROW) and access road maintenance b…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to replace existing Structures 30/9, 31/2, 34/3, 34/5, 35/2, 36/7, …
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to replace existing Structures 30/9, 31/2, 34/3, 34/5, 35/2, 36/7, …
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to conduct routine right-of-way (ROW) and access road maintenance b…
WAPA proposes to remove one Gray Pine tree on the west side of the AIR-CW line near tower 9/4.…
BPA proposes to replace cross-arms on the Swan Valley-Teton No. 1 transmission line on structure 10/1 and structure 29/4 on the No. 2 transmission …
Scope of this work order is to install a temporary cooling system for the fourth level control room at 221-8H fan house.…
The Critical Utilities Rehabilitation Project (CURP) at Brookhaven National Laboratory includes replacement and/or upgrades and improvements to the…
This PLC is obsolete and needs replacement. The existing GS PLC and two remote I/O drops (2 and 3) require upgrading to the latest Emerson DeltaV c…