Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to conduct routine access road and right-of-way (ROW) maintenance o…
This EEC covers all low hazard, routine, and repetitive task work activities that can be performed in the Savannah River Remediation (SRR) Faciliti…
This EEC covers the design for the relocation of part of the 234-H Finishing Line process to 233-H.…
Prep and paint the 614-24G “C” Area WIND tower, 614-23G “F” Area WIND tower, and 614-22G “H” Area WIND tower.…
Repair and/or replace non-asbestos floor coverings in Building 730-4B.…
Implement modifications to Building 751-1A that include drilling into transite to mount photoluminescent exit signs and to relocate an electrical r…
The 115 kV transformers, both switchgears A and B, associated 4160V secondary cables, protective relaying, breakers, and control wiring, 480V trans…
Circuit cards that are in need of repair have a conformal coating making it difficult to take measurements to identify non functioning components.…
Humate tanks and associated piping will be flushed with water to remove Potassium Humate (BorreGro HA-1) solids that have settled in the tanks and …
Repair damaged/rotten wood panel in the lead change out area of 711-4N.…