Construction will perform light pressure wash and paint exterior of trailers (no scraping) on 704-49E, 704-50E, 704-51E, and 704-66E.…
Clean and apply Cool Seal coating to roofs of Trailers 704-31E, 33E, 37E, 49E, 50E, 51E, and 66E.…
Replace Universal Wiring in 707-F…
Conduct a groundwater source investigation, to include boring and piezometer installations at the Rifle disposal site located in Garfield County, C…
BPA proposes to replace a wood pole structure damaged by woodpeckers and associated structural/electrical components (e.g. cross arms, insulators, …
BPA plans to perform road maintenance to improve approximately 5,275 linear feet, and to construct approximately 400 linear feet, of access roads f…
BPA proposes to fund the Jefferson County Soil and Water Conservation District (JCSWCD) and the Oregon Department of Fish and Wildlife (ODFW) to co…
BPA proposes to replace insulators, remedy impairments, improve access roads, and install fall protection along the approximately 26-mile-long Wine…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to conduct routine vegetation management along its Curecanti-Blue M…
BPA proposes to replace two switches with new switches that meet safety and quality standards.…