Remove trees, underbrush, and all unwanted vegetation around the perimeter of K-Ash basin.…
L-Basin HFIR Resin Cleaning Stations.…
With increasing workloads and incoming new hires, the need to upgrade the CCR has become a priority.…
Subcontractor will provide roof repairs at 785-6A.…
Grade, Pave, Stripe and Add Erosion Control Measures to Existing Gravel Parking Lot at 742-G trailers.…
Perform repairs to the interior of Building 706-N.…
BPA proposes to perform in-kind replacement of wood pole structures and associated structural/electrical components (e.g. cross arms, insulators, g…
BPA proposes to improve and repair approximately one mile of access roads along the Schultz-Raver No. 3 transmission line to access transmission st…
WAPA proposes emergency replacement of a spacer on one span of its CPJ-ODA transmission line, near a crossing of the Pit River.…
The Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), conductstransmission and distribution line structure replacements in sev…