To maintain reliable power to the region, Bonneville Power Administration (BPA) proposes to replace a wood structure in line mile 14 with a steel m…
The US Department of Energy (DOE) proposes to perform mechanical replacements and/or upgrades of the Advanced Light Source (ALS) switchstation A3 (…
Subcontractor will perform a core sampling of roofs Buildings 232-H, 264-H, and 264-2H with the SRS asbestos group. Sampling locations will be patc…
Replace Nitrogen Pressure Safety Valves (PSV's) per preventive maintenance work packages.…
The Furnace 100 Process Chilled Water has been shown to be overly acidic for its process function and needs to be drained.…
Sanitary Waste Treatment Facility-Re-coat Concrete Surface in the UV Channel and Cascade System.…
Site construction will regrade the ditch along side building 713-3N to prevent water intrusion…
617-G Replace floor tiles.…
Scope-Clean oil spill in 715-3N fuel dike and repair pressure control device.…
789-B Repave Driveway…