The attached Scope of Work provides details for the replacement of PIV 2070, which will be replaced with PIV 2230.…
The PA is to remove a thermally actuated valve that is currently integrated into the fire suppression system (FSS).…
This EEC covers all excavation work activities at SRS when it has been determined that a CERCLA O and M Plan is NOT required.…
Housekeeping the 105-C Stack Area.…
This EEC covers all maintenance activities performed by SRNS organizations that have the potential to disturb gasket and gasket-like materials (i.e…
This EEC covers all excavation work activities at SRS when it has been determined that a CERCLA O and M Plan is required.…
Installation of flow restricting orifices on flammable gas cylinder installations throughout 773-A Section C.…
This DCF provides the design for the following functions: (1) Isolating Mass Spec 20 from Mass Spec 22 by blanking the interconnect manifold to all…
Janitor's closet enhancements to be done in 704-K.…
Subcontractor will provide roof repairs at 770-A with addition of Hydro-Stop coating.…