704-N Remove wall between rooms 12A and 12B.…
Kitchenette enhancements to be done in 704-K Room 14.…
CX-022752: Miracle Mile-Snowy Range No. 1 115-kV Transmission Line Vegetation Management (Hand Work)
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to conduct routine vegetation management along its Miracle Mile-Sno…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to conduct routine vegetation management along its Miracle Mile-Sno…
This EEC covers various routine maintenance activities that occur in the buildings within the MOX Complex Area.…
Remove Asbestos Presumed Asbestos Containing Material (PACM) gaskets, then remove leaking valve RWW-101 and replace with new valve, reinstall insul…
The proposed activity involves repositioning of copper service lines in 773-A C-143/147 (RBA).…
This EEC is for the design to update valve actuator and limit switch for H-233000-DET-HV-1267331 (aka DS-118) per M-DCF-H-13811.…
Clean Air Handling Unit (AHU) No. 5 drain line at Building 772-F.…
702-A Water Intrusion Recovery.…