Subcontractor will provide a roof replacement at 705-H.…
This activity is to replace the 151-1L DC breaker panel due to age and normal wear over time.…
This activity involves the installation of external oil sampling ports on various electrical transformers throughout SRS.…
Maintenance will remove/replace Tank 181 East and West strainer to inspect for blockages and clean.…
Scope of activity is Architectural and Electrical installations in Lab C-108/112 Bldg 773-A per WO 1903862.…
This modification will align 9.2E evaporator configuration to 9.1E by placing the 9.2E Vent temperature instrumentation to an Out of Service status…
One access port needs to be drilled into the top of F-Tank Farms 242-3F Concentrate Transfer System (CTS) cell cover to allow flexible hoses into t…
The Regulated Drain Collection Tank Heater Controller is to be replaced.…
Replace High Pressure Sodium Lamps with Light-Emitting Diode (LED) lights.…
The Defense Waste Processing Facility (DWPF) wiring and pumps are to be upgraded in select locations.…