The Saltstone Bulk Material Handling (BMH) system is experiencing varying levels of deterioration to the metal thickness of the batch Weigh Hopper.…
Current Transmitters to be installed for Saltstone Mixer Alternating Current (A/C) current monitoring.…
The jockey pump controllers associated with the fire pumps will be replaced to maintain proper system function.…
Subcontractor will provide roof replacement at 151-1C.…
Recovering refrigerant from non-radiological appliances in L-Area that contain less than 5lbs refrigerant at full charge.…
Occasionally, the vacuum lines in the 735-B hood systems need to be repaired with new lines due to normal wear and tear.…
Bonneville Power Administration (BPA) proposes to remove and replace certain fittings used to splice lengths of transmission line cable together on…
The existing gravel road around the E-Area Trailer Complex will be paved.…
717-F Annex renovations.…
The obsolete recloser on H3B feeder is reaching the end of its life cycle and should be replaced.…