Auburn University proposes to develop for commercial demonstration an integrated cost/time reduction and quality improvement by implementing powder…
The Research and Sounding Rocket (RASR) team will be preparing and launching research rockets at various off-site locations.…
Remount the first sink in the men's restroom in Building 706-19C.…
Remove and repair/replace exhaust fan in bathroom/locker change room of Building 704-H to ensure proper air flow in common areas.…
Remove damaged carpet, paneling, and correct drainage in 719-N.…
Excavate to expose damaged sewer pipe. Repair/replace pipe.…
Electical receptacles to be installed in the Clerk and Shift Managers Offices in Building 105-K.…
Replace the existing Carbon Steel Nitrogen Exhaust Line for the SAS glovebox with Stainless Steel Piping and remove the old Dewar manifold.…
BPA proposes to fund the Colville Confederated Tribes to perform ongoing routine operations and maintenance on its wildlife management areas/mitiga…
Site construction will prep and paint the curbs and traffic stripping around the exterior of 735-4B.…