The City University of New York (CUNY) proposes to obtain and provide experimental data on the plenum to plenum natural circulation flows in a high…
Rensselaer Polytechnic Institute (RPI) proposes to study critical data for fuel-coolant-cladding chemical interaction and compatibility for uranium…
Auburn University proposes to develop for commercial demonstration an integrated cost/time reduction and quality improvement by implementing powder…
The Research and Sounding Rocket (RASR) team will be preparing and launching research rockets at various off-site locations.…
Remount the first sink in the men's restroom in Building 706-19C.…
Remove and repair/replace exhaust fan in bathroom/locker change room of Building 704-H to ensure proper air flow in common areas.…
Remove damaged carpet, paneling, and correct drainage in 719-N.…
Excavate to expose damaged sewer pipe. Repair/replace pipe.…
Electical receptacles to be installed in the Clerk and Shift Managers Offices in Building 105-K.…
Replace the existing Carbon Steel Nitrogen Exhaust Line for the SAS glovebox with Stainless Steel Piping and remove the old Dewar manifold.…