Replace the existing Mercury Cabinet (HV-HOOD-2), Collection Tank (WEE-COL-1) and associated components and piping/tubing.…
703-23B Repaint Centerra dog kennels.…
Remove space saver and install 6 new modular cubes in 730-4B.…
Safety items in H area (outdoors) will be repainted due to fading due to sun exposure.…
Subcontractor to patch the asphalt that was damaged located directly outside the 980-S Loading Dock and 704-S.…
Repaint floor areas over fixed contamination in 105-L.…
The proposed solution addresses the requirements for the design, installation, and performance testing of replacing Diffuser (DI) System DE Vessel …
A Process Air pressure reducing station to operate pneumatic tools will be installed in the Saltstone Facility Process Room.…
The Saltstone Facility Bulk Material Handling (BMH) system is experiencing issues with the butterfly and knife gate valves.…
Install pipe support on 782-A bypass.…