Remove and replace 922 Condensate Tank Pump A in -20 of 105-L.…
Bonneville Power Administration (BPA) proposes to fund Tacoma Power to replace two of their wood pole transmission line structures.…
The scope of work is to repair the ZPPR North Tunnel, restoring its strutural integrity to support continued operation…
Install aerial survey monuments for aerial survey activities at the Green River, Utah, Uranium Mill Tailings Radiation Control Act Title I Disposal…
Re-coating and re-lining of 2-inch and 4-inch sewer lines beneath Building 235-H.…
Subcontractor will provide roof repairs at 248-H.…
Site construction will prep and paint the exterior of the 735-B Stack and the associated fiberglass exhaust duct.…
Construction personnel will repair floors, walls, and ceilings on the 4th Level of H Canyon as specified in the referenced work orders.…
Abandoned fuel oil heater at 725-2N will be removed and disposed of at the scrap and salvage yard.…
Two (2) abandoned fuel oil heaters at 725-1N will be removed and disposed of at the scrap and salvage yard.…