(PM 3814-B) Bi-annual PM Clausing Horizontal Wet Cut Band Saw (KC812W) 717-3N…
Repair Water Leak in 704-49A…
Adjustment to Piping for Saltstone Hopper Overflow Container (SHOC) Modifications…
Pressure Wash/Clean Bird Droppings in F Area…
Domestic Water System Monitoring Equipment Upgrades/Repairs…
Glovebox Stripper Blower Redesign…
717-3N Clean, Prep, Seal, and Stripe SW Portion of Parking Lot…
Replace Fire Sprinkler Heads…
Repaint Striping Around the Decon Hut in 105-L…
The Kesselring Site Southeast Quadrant Decontamination and Dismantlement Project will remediate, dismantle, and dispose of above and below grade structures and utilities associated with Building 5, Building 5A...