Remove 282-H switchgear from service, air gap 13.8kV feeds, D and R 282-H structure.…
Replace MPC Crane High Pressure Sodium (HPS) Light with LED Lights.…
Identify the location of the caustic line leak at 211-H and perform necessary repairs.…
714-2N Replace carpet and paint.…
The disposal site would continue to be visually inspected on an annual basis…
The contractor will install and remove scaffolding, operate aerial lifts, provide supplies, equipment and material storage trailers in the work area to support execution.
Upgrade the communications/server room with clean fire suppressant system,HVAC units, fire and HVAC controls,and raise floor for fire suppressant s…
Upgrade the communications/server room with clean fire suppressant system, HVAC units, fire and HVAC controls, and raise floor for fire suppressant…
Upgrade the communications/server room with clean fire suppressant system, HVAC units, fire and HVAC controls, and raise floor for fire suppressant…
Bonneville Power Administration (BPA) proposes to remove structure 3/10 and to replace structures 3/9 and 4/1 on the 115-kilovolt (kV) Ellensburg-M…