This EEC covers various general renovations for buildings 725-N, 725-1N, and 725-2N in Central Shops. This revision includes the installation of ad…
Demo/removal of the windows/panels on the east wall of Building 83 at the NETL Pittsburgh Site and the replacement of these windows/panels with a c…
The most schedule and cost effective solution for INL's future mission is to convert operation and management of existing telecommunication transpo…
This project replaces the existing, retired #4 Boiler, located in the boiler house (Kesselring Site (KS) Building 8), with a new boiler and sub-syste
BPA proposes to remove a tree that has fallen on the 13.8-kilovolt double-circuit Big Cliff-Detroit PH 1-2 No. 1 and No. 2 transmission lines betwe…
BPA proposes to replace 12 deteriorating wood poles and associated structural/electrical components (e.g. cross arms, insulators, guy anchors, etc.…
This ECP covers the Laboratory Directed Research and Development (LDRD) project which started in FY-18 and will continue into FY-21.…
709-1G, Replace damaged tile and wallboard in ladies shower.…
Remove and repoint deteriorated mortar joints as necessary. Cut-out and caulk cracks in masonry with a high strength/low modulus epoxy. Patch exist…
Bonneville Power Administration (BPA) proposes to fund operations and maintenance (O and M) on lands owned and managed by the Kalispel Tribe in Was…