Repair and Replace Packing of 1 Steam Valve Outside of K-Area Purification and 2 Steam Valve Inside of Purification…
The subcontractor shall replace wooden line switch ties from the railroad bed, identified by site transportation and engineering as part of the 202…
Perform structural repairs on 772-F and 772-1F per the structural integrity program, SIP, inspection report T-CLC-F-00557.…
Install Universal Wiring, UW, drops in Building 730-2B.…
Subcontractor will provide roof repairs at 713-3N.…
To provide building transition section, plenum, details for portable HVAC unit for 105-13K building.…
The 233-24H warehouse building heat pump is being replaced and utilizes slightly different controls.…
Renovate the 264-1H Rm 151 kitchen with new flooring, paint, countertops, and cabinets.…
LED upgrade of exterior lighting of building 247-H…
A vendor will generate and or remove excess wastewater from various systems and containments located across SRS.…