The Building 233-H Special Container Loading/Unloading (SCLU) Stripper Valve Replacement outage consists of the following activities: 1. Replace th…
Office of NEPA Policy and Compliance
February 4, 2022The Building 233-H Special Container Loading/Unloading (SCLU) Stripper Valve Replacement outage consists of the following activities: 1. Replace the return and collection valves for the Primary and Secondary Stripper Systems in SCLU Glovebox. New models for both the valves, actuators, and limit switches will be utilized. 2. Replace the manual throttling valves located on the Primary Stripper collection and return piping. A new model of valve will be utilized, changing the design from a ball valve to a globe valve.