This activity will upgrades the electrical system at the 901-H Segregation Cooling Water Valve Pit.…
This EEC covers all maintenance work performed by SRNS Organizations on steam lines located at SRS.…
The Slurry Mix Evaporator (SME) “Jog” feature is to be removed from Distributed Control System (DCS) and is to be re-located to the Motor Control C…
Doors in Building 292-2F will be disassembled, lubricated and/or repaired as necessary and reassembled.…
US and S will replace the degrading dock shelters at 731-1N.…
Renovation of the 724-50E Bathroom Trailer including several activities for the inside and outside of the trailer.…
Perform planned maintenace/renovations on the interior walls, floors, windows and doors of buildings 711-N, 711-2N,
50 Ohm Resistance Thermal Devices (RTD) shall be replaced with100 Ohm Platinum RTDs.…
Subcontractor to perform roof repairs on building 730-A.…
Refurbishing and repairing roof, windows, floors, and interior walls for 704-29E and 704-30E.…