Paint building exterior at 251-H.…
Subcontractor will provide roof repairs at 719-5N.…
Installing new door in 773-A, A-Wing.…
773-62A Sand and paint handrails on steps at trailers.…
This EEC covers general renovations and modifications to C and B Wing in 773-A.…
Scope of work includes installing Medintech flooring, and base molding. Also clean/prep and apply paint to the ceiling, walls, doors, cabinets as n…
Damaged floor and tile will be removed and replaced in 704-28E.…
Prep and paint walls in the 704-59E Conference Room.…
The 291-F stack isokinetic sampling rake will be cleaned by flushing air through it.…
This EEC covers the evaluation and corrections of HVAC compressors units in 773-A.…