Install an automatic transfer switch (ATS) to provide two different sources of electrical power to lighting panel PNL PP1 in Building 703-44A.…
The HANM Classified D/3 DCS 16000 I/O modules in PCM-13 that interface with field instruments and controls have exceeded end of life.…
The proposed activity involves reconfiguring copper lines, removal and disposal of an accordion curtain, the removal and disposal of a non-rad glov…
Maintenance of Li-COR 7500 Infrared Gas Analyzers used to monitor Carbon Dioxide concentrations at two meteorological towers, one located onsite at…
Two Normetex pumps in the 233-H Purge Stripper System (PRGS) will be replaced by two Edwards nXDS15iR Scroll pumps in order to save the Normetex sc…
This is a Contingency Work Package to replace the Saltstone Grout Pump-9001 if required.…
Install WIFI in 642-E.…
736-A Evaluate/correct missing jacketing on water supply line.…
This modification will upgrade the detection system, install duct smoke detection, install pull stations, provide HVAC emergency shutdown, and upgr…
701-8G Excavate the top of the septic tank.…