This EEC covers all maintenance work performed by SRNS Organizations on steam lines located at SRS.…
Piping will need to be removed and worked to fit the new filter. Some piping components will be replaced.…
Subcontractor will provide roof repairs at 705-H.…
Subcontractor will provide roof repairs at 249-H.…
Apply roof coatings and seal roof leaks.…
722-N, Remove carpet/tile and cove base due to water intrusion.…
The attached Scope of Work provides details for the replacement of PIV 2070, which will be replaced with PIV 2230.…
The PA is to remove a thermally actuated valve that is currently integrated into the fire suppression system (FSS).…
This EEC covers all excavation work activities at SRS when it has been determined that a CERCLA O and M Plan is NOT required.…
Housekeeping the 105-C Stack Area.…