This EEC covers the upgrades required to ensure the N-area "Paint Barn" 725-2N meets or exceeds NFPA Class 1 Division 2 requirements within the int…
731-4N Correct toilet in women's restroom.…
Install new shelf guard rails in building 713-N.…
Relocate and Demolish N-Area Trailers.…
Receiving Basin Off-Site Fuel (RBOF) Cask Pad Containment Activities…
Fan 929 Subsystem Improvements, K-Area: Changes to air flow, controls and the heating system.…
Parking Lot 613-1K and Quonset Building 663-K Paving…
A new gate valve will be mounted downstream of the existing V-019 valve. The new valve will have supports mounted under it to reduce the cantilever…
A Radar Indicating Level Transmitter will be installed on the Salt Feed Tank.…
Replace posts and cables that span Lower Three Runs and Four Mile creek bed. These cables support the flow tracking device used to measure stream f…