Simulants will be prepared for testing at SRS to evaluate the effects of various reagents on groundwater brine chemistry.…
Standing dead palm trees outside of 706-5F and 226-2F need to be removed.…
Subcontractor will perform roof repairs on 723-A. The Subcontractor "will not" disturb the existing roof on 723-A.…
C. E. Bourne Subcontractor 00000611 will perform a roof repairs on 735-11A. The Subcontractor "will not" disturb the existing roof on 735-11A.…
Subcontractor will perform a roof repairs on 749-A. The Subcontractor will not disturb the existing roof on 749-A.…
Lab C-059 needs a new T-branch and piping to supply an argon connection point to a hood.…
K-Area CCO Storage Pad Wire Guidance Tracking System Modification.…
Replace all floor tiles at 702-1C per Acknowledgement of Scope.…
SRS has identified potential locations that could support a utility-scale solar power plant to achieve the goal of 100 percent Carbon Pollution Fre…
This project is specific to the implementation of a Record of Decision (ROD) for three FFA subunits that are located within the N Area boundary: Ea…