713-N Replace exterior door No. 7.…
Installation of UW Drops 704-1N Rm. 180.…
Installation of UW Drops 704-1N Rm. 117…
UPC sub-contractor to remediate asbestos before demolishing and removing (2) unused Handi-Houses to the C and D Landfill from the HY1 Laydown Yard.…
A 20 foot sealand/conex will be relocated from K-Area to SRPPF for use as a universal waste storage area.…
Subcontractor will provide roof repairs at 776-1A.…
The work will look at the effects of exposure to short-chain PFAS and polymeric PFAS (fluoropolymers) on nematodes using indirect and direct exposu…
All Uninterruptible Power Supply (UPS) systems not related to security or cranes will be removed from L-area.…
This EEC covers all low hazard, routine, and repetitive task work activities that can be performed in the Savannah River Mission Completion (SRMC) …
Refurbish/repair domestic water monitoring equipment, wiring, and waterproofing improvements for domestic water pits per attached SOW G-SOW-G-00364…