Remove/Reinstall 181 Drain Tank Outlet Valve and Replace Pump P-T181…
The flooring in 702-H will be replaced.…
50 Ohm Resistance Thermal Devices (RTD) shall be replaced with100 Ohm Platinum RTDs. Associated Recorder shall be reprogramed to accept the new 10…
Water Monitoring Equipment Deployment in F and E Area Basins…
There is one approx. 35 cu ft, non-flammable Nitrogen Compressed Gas (cylinder) that was part of a night vision purge kit. We plan to vent it.…
Isolate and remove 704-Z clean air handling units.…
Isolation and removal of HAAS TL-3 CNC Lathe (DOE 011809) from building 226-2F to building 717-F machine shop. Preparation includes, but is not lim…
Contractor has evaluated a termite infestation problem at Building 735-B and will provide treatment per G-SOW-B-00304.…
This activity is for completing a safe shutdown and deactivation process for F/H Lab (772-F, 772-1F and 285-3F). This process is required to prepar…
Provide labor, materials, services, and supervision to recoat the interior and exterior of the 902-6G fire water storage tank in accordance with th…