Salt simulants and cementitious waste forms will be made at EDL for testing up and including to 55-gallons.…
Purify solutions of dissolved actinides using ion exchange, valence adjustment, precipitation, filtration, and calcination.…
An underground leak in the Cooling Water System (CSW) piping has been detected. A temporary CSW feed to Melter Cooling Water (MCW) is needed during…
Replace glovebox oxygen alarm panel annunciator in Control Room of Building 264-H.…
CX-030718: Replacement of Scanning Electron Microscope (SEM) in Inert Metallography Laboratory (IML)
The JEOL JSM-6460LV Scanning Electron Microscope (SEM), along with all peripheral attachments, are to be removed and replaced with a new SEM.…
With the evolving construction of the Surplus Plutonium Disposition (SPD) Project an existing Quonset hut (763-111N) will be removed, and a new fab…
Tornado shelters shall be installed in various places around F-Area to support the SRPPF project.…
The Bier lab investigates how microbial communities control the flow of energy and matter through ecosystems by combining microbial ecology and bio…
105-L Security System Modifications.…
105-L Security System Modifications.…