The 211-8H women's restroom is to be remodeled to remove the shower and the existing 2 inch shower drain line and replace it with a 4 inch drain l…
The general services H-Canyon Hot and Warm Crane Controls currently operate on obsolete programmable logic controller processors.…
681-3G Elevator Replacement/Modernization…
717-F Sidewalk Repair Per AOS.…
Remove steam line feeding 294-F. 294-F is out of service and does not require steam. The steam header to 294-F is out of service and air gapped on …
Previous evaluation of the Variable Frequency Drives (VFD) for 735-2B Return Fans 001 and 003 has resulted in a determination that the VFDs have fa…
Various glass types will be evaluated for vitrification of Uranium-Zirconium (UZr) spent fuel simulants.…
SRNL will determine the moisture retention properties of various formulations of cementitious materials that are representative of SRS and offiste …
Laboratory 141 and 193 of the 999-2W facility will be used to perform general chemical and nanomaterials research support for a variety of DOE-rela…
The EEC covers the painting of exterior doors, sealing and coating of the base of south east corner of building 717-26N.…