Modify TRU Pad 26 to Remove Equipment Currently Installed.…
Painting without stripping/sanding/scraping in L Area Complex.…
The HVAC unit at ETF is out of service. Temporary use of 2 heat pump units containing a maximum of 12 lbs of R410A refrigerant each, will be utiliz…
The 50-ohm resistance thermal device (RTD) for 15.3 will be replaced with a 100-ohm Platinum (Pt) RTD. The control system shall be reprogrammed to …
Configuration Changes Necessary for safe Operation of the Chemical Injection System Which Injects CL4132 to the Service Water Header.…
The current capacity of 607-7B Sanitary Lift station is undersized based on existing personnel loading in building 730-2B and 730-4B. The 607-7B sa…
Building 707-1F is in need of minor repairs/renovations prior to housing personnel in office spaces.…
Installation of industrial curtains in order to prevent the nesting of barn swallows at 292-2F.…
701-20G Correct Water Line Mounting at Barricade 1 per AOS (Acknowledgement of Scope).…
Maintenance will replace the 704 condenser which has been deemed inoperable due to normal wear and tear.…