716-B Install receptacles for new tire machines. Tire machines are out of service and ordered new machines that have now arrived, but need a 24V co…
Renovations in the 918 Room Material Access Control (MAC) Center and 914 fan room…
The proposed work activity is the replacement of the entire 772-4F.…
The objective of the Campus Master Plan is to create a site infrastructure vision in alignment with site missions at the Savannah River Site. This …
Analysis of water samples using liquid scintillation spectrometry.…
Passive counting of potentially radioactive samples using commercial radiation counting systems (i.e. alpha, beta, and gamma detectors/counting sys…
Diffuser-O2 Monitor Relocation Due to Miscoordination with Y839 Equipment…
Renovations to High Bay Rooms in Training Support Building 766-H and Installation, Maintenance, and Operation of equipment for use by SRPPF Trainin…
Aluminum Canopy Placed Adjacent to 711-K…
This work involves the use a new reactor manifold in lab 154, 999-2W. The purpose of the reactor is to qualify the performance of heterogeneous cat…