Water Monitoring Equipment Deployment in F and E Area Basins…
There is one approx. 35 cu ft, non-flammable Nitrogen Compressed Gas (cylinder) that was part of a night vision purge kit. We plan to vent it.…
Isolate and remove 704-Z clean air handling units.…
Isolation and removal of HAAS TL-3 CNC Lathe (DOE 011809) from building 226-2F to building 717-F machine shop. Preparation includes, but is not lim…
Contractor has evaluated a termite infestation problem at Building 735-B and will provide treatment per G-SOW-B-00304.…
This activity is for completing a safe shutdown and deactivation process for F/H Lab (772-F, 772-1F and 285-3F). This process is required to prepar…
Provide labor, materials, services, and supervision to recoat the interior and exterior of the 902-6G fire water storage tank in accordance with th…
Floor tile will be replaced at 702-S.…
Routine electrical and mechanical fabrication, assembly, testing, installation, operation, and maintenance activities performed by R and D Engineer…
Hands-on" fabrication activities covering the assembly of equipment and systems designed by the Energy Security and Engineering Department for SRNS…