Vibromet polishing machine will be used for final, high-quality polishing of R and D samples.…
An advanced protocol security oven will be modified and used to simulate an industrial process for research and development purposes. The oven will…
This EEC covers the use of the non-rad pyroprocessing system. The pyroprocessing operations to be tested on this system are molten salt extraction …
Subcontractor will provide roof repairs at 704-7B and 704-12B. The Subcontractor will not disturb the existing roof while performing these repairs …
K-Area Plutonium Down-Blend Processing Enhancements: Leaded Glass Shielding…
Deactivation of facilities 284-8F and 280-1F.…
A Japanese Cask will have a temporary modification made to allow it to be repositioned from the side.…
Per modification traveler MT-TRI-2024-00002, two additional unclassified DCS workstations are required to be installed in the Building 233-H Centra…
Remove water fountain and associated water filter from 247-H. Replace the water fountain with a bottle filling / water fountain combination.…
Replace the 50 ton chiller (T948-500-10) located inside of Building 249-H.…