Minor renovations will take place in the SREL "brooder house" animal holding facility.…
Removal of old Compressor tank and installation of new one.…
Remove disconnected legacy electrical components on a small pad south of 190-K.…
Small sections of sidewalks to be repaired in K-Area.…
Evaluate and correct water damaged tiles in 221-H, section 9 personnel tunnel.…
Installation of Digital Signage in 709-1G Room 5.…
Provide dedicated circuits for new printers in room 213 in 773-52A.…
Non-radioactive laboratory testing using simulants to study evaporative separation and solution oxidation, hydrolysis, and solubility of trace regu…
Metallography examination of contaminated samples will be performed. Contaminated materials requiring metallurgical evaluation will be cut, if nece…
Install Two New Doublewide Trailers in B-Area.…