Activities to troubleshoot, repair and/or replace light fixtures in radiological and non-radiological areas of L-area.…
Protective Bollards Installation at 715-K Fuel Station…
Chilled water pump #1 is no longer working at 285-H. Pump #1 will be replaced with like for like pump to restore dependable operability.…
Upgrade men's and women's locker rooms in 704-K. Revision 2 is specific to the removal/replacement of existing flooring in Room 18. Both men's and …
The Bundle Storage (MTR) Rack is Safety Significant Design feature that is located in Section 3 of the Hot Canyon of 221-H. This DCP replaces exist…
Roof Repairs, 705-K…
Subcontractor shall provide inspection and cleaning as necessary of SRS cafeteria Exhaust Hood Systems located in 766-H and 704-S. This effort shal…
This activity is for completing a safe shutdown and deactivation process for F/H Lab (772-F, 772-1F and 285-3F). This process is required to prepar…
Installation of a double-wide trailer in E-Area. This revision includes the installation of a sidewalk along building 704-75E.…
Trailer 704-13Z is to be relocated to area west of 704-84H.…