At the P Area Burning Rubble Pit (131-P) Operable Unit (PBRP OU), four shallow groundwater monitoring wells will be installed along the bank of Ste…
One existing well (CMP010A) is planned for abandonment and replacement well (CMP010AR) is planned for installation at the CMP Pits Operable Unit.…
CX-030090: Design and Replacement of 13.8kV Process Feeders 1 and 2 and Associated Equipment, K-Area
Design and Replacement of 13.8kV Process Feeders 1 and 2 and Associated Equipment, K-Area…
SRNL will evaluate the activation of new, non-tritiated hydride beds in support and as requested by Savannah River Tritium Engineering.…
Drain Approximately 5 Lead acid batteries located at the Transformer Laydown Yard at 622-N.…
Perform office renovations in 704-L…
Office trailers 704-19H and 225-5H, are approximately 36 years old. The trailers roof, flooring and weather seals surrounding windows and door open…
Replace Lift Station Pumps at 607-66G.…
Six single-wide trailers will be removed and replaced with three new double-wide trailers near gate 16.…
B-Area replacing trailer doors due to water damage.…