Design, install, implement use of a robot/robotic arm within the K-Area 105 Building Materials Storage Area (MSA).…
105-L Skoda Cask Equipment Qualification/Processing/Shipment Preparedness.…
Renovation to rooms 139, 140 and 148 in 737-A.…
Replace Fire Alarm Panel / Components at 785-6A and 785-1A.…
The common copper service water header in 784-7A is being replaced with PVC piping. This activity is being performed to minimize the potential risk…
Deteriorated ACM (Asbestos Containing Material) window glazing will be removed and replaced at 760-11G.…
Subcontractor will provide roof repairs at 211-42H. The Subcontractor will not disturb the existing roof while performing these repairs on 211-42H.…
Remove/Reinstall 181 Drain Tank Outlet Valve and Replace Pump P-T181…
The flooring in 702-H will be replaced.…
50 Ohm Resistance Thermal Devices (RTD) shall be replaced with100 Ohm Platinum RTDs. Associated Recorder shall be reprogramed to accept the new 10…