This EEC covers the removal of a walk-in refrigerator unit (207C) inside of 737-A laboratory 207 and the repair of walk-in unit located outside of …
A Japanese Cask will have a temporary modification made to allow it to be repositioned from the side.…
Construction will remove asbestos insulation in support of maintenance activities.…
Replace Flooring at 709-1G and 709-7G.…
Replacement of Duct Detectors in 704-C, 705-C and 705-1C.…
730-B and 730-1B Replace automatic entry doors.…
Adjustments to the Saltstone Process flushing sequence.…
The dust collector (Z-205000-BMH-DCOL-0002) for Silo No. 4 is to be replaced.…
Soil gas samples will be sampled using a soil gas probe and analyzed for the possible presence of radon.…
CM 4422 TS/Repair electric heater No. 1 at 717-10N.…